In June 2023, a roof of the amphitheater of the Municipal Theater in Most was successfully completed. The membrane structure has been specially designed to provide protection from the sun and rain above the stage, while making the entire space a visual attraction. The author of the design is Carl Stahl & spol.; the calculation was carried out using the programs RFEM 5 and RWIND 2.
At the end of April 2023, a new aviary was completed at the Sichuan Pavilion in the Prague Zoo. The aviary structure has a length of 14 m and a width of 10 m. The company Carl Stahl & spol. created the architectural and structural design, calculated in RFEM 5.
The Museum of Contemporary Art & Planning Exhibition (MOCAPE) in Shenzhen consists of two parts that are independent and organically unified. Two venues are combined in one building: the Museum of Contemporary Art (MOCA), and the Planning Exhibition (PE).
The Moongate residence, located in Sedona, Arizona, USA, was exceptionally designed by the Scottsdale-based architecture and planning studio of SWABACK.
The LEICHT company was awarded the design phase for the Champagne Bar’s new roof, located at the Goodwood Racecourse. The planning steps included the form-finding process, the membrane and supporting steel structure approval and design, and the membrane and cable cutting patterns.
The Under Canvas company provides a unique opportunity for all-inclusive adventure glamping (glamorous camping). Established in 2009, the company has grown to include multiple luxury glamping resorts and customized events all over the country.
The recent trend in high-rise construction is clearly dominated by timber as the most ecological and environmentally-friendly material. The project promoter Nexity Resolutely is committed to constructive building solutions with a reduced carbon footprint through various labels and certifications included in its several office and commercial timber projects.
Among these is the Palazzo Meridia, which is currently the tallest CLT office building in France. Dlubal customer CBS-Lifteam was responsible for the planning, supply, and installation of the timber structure.
A kindergarten, designed according to Building Information Modeling (BIM), is currently under construction in the Tyrolean municipality of Schwoich. The digital 3D model accompanies the construction project from design until completion.
The architectural planning was performed with Autodesk Revit. The structural model, including cross-sections, materials, loads, and so on, was exported to RFEM with the direct interface and designed there.
The engineering office Études Techniques Lyonnaises was commissioned with the structural design of the foundations for a new unloading area of an industrial site in the department of Isère, France.
The new unloading area consists of a steel structure built on a foundation plate. The total area is divided into two parts: a traffic and unloading area for rail vehicles, and an area with a pit and a traffic zone for lift trucks.
In Roost, Luxembourg, a new building complex is being built that relates to cars. Up to six car dealerships, a parking area, and a paint shop will be built on the site. The construction project was divided into two planning phases. The first phase includes three multi-story car dealerships. They have the same supporting structure.
Théâtre Marigny is located on the Avenue des Champs-Elysées in Paris. The building (hall, ceiling, decor) as well as the wooded area, situated next to the Elysée Palace, have been declared historical monuments.
Regular maintenance and repairs of an aircraft include performing aircraft engine testing. For the protection of the residents in nearby communities, Flughafen Zürich AG (FZAG) commissioned the planning of a noise protection hangar which goes beyond the legal requirements for noise protection.
The 5-story residential building with an impressive ecological balance was presented at the International Building Exhibition (IBA) in Hamburg, Germany. Being CO2-neutral in both its production and operation, the Woodcube's energy level corresponds approximately to that of a passive house. All material used in the timber cube is completely recyclable and biodegradable.
Isenmann Ingenieure from Haslach, a customer of Dlubal Software, was in charge of the structural planning. The calculation and design of the access core and the pile foundation made of reinforced concrete were performed in RFEM.
In 2008, the German company Messe Frankfurt organized an architectural competition for planning the redesign of the northern and southern gates leading to the exhibition center. The goal was to design a guardhouse and a roof for each gate. The building owner wanted the roofs to be developed as extraordinary structures with high recognition value.
During the Antarctic summer months of 2010/2011 and 2011/12, a new research station was built in East Antarctica for the Indian Ministry for Earth Sciences. The design and planning came from the German offices of bof architekten and IMS Ingenieurgesellschaft in Hamburg, Germany.
The complex structural system consists of an enveloping steel structure and a total of 134 special containers integrated to transfer vertical and horizontal loads. The final structural analysis was carried out by the German engineering office of KSF in Bremerhaven.
In autumn 2012, construction started in Wörgl, Austria for an apartment complex that was, by request of the building owner, completely planned and designed as a BIM model, including structural analysis, work planning, call for tenders, and so on.
For this purpose, software tools from the company bimm GmbH were used, by which architects, structural engineers, and building engineers could work together efficiently on a 3D model. RFEM and the Autodesk programs Revit Architecture and Revit Structure, to which Dlubal has a direct interface, served as the basic software for this project.
The Kuchlbauer tower is an architectural project built on the premises of the German brewery Kuchlbauer in Abensberg, Germany. The tower, with a height of 112.1 ft, was designed by the Austrian artist Friedrich Stowasser, better known as Friedensreich Hundertwasser. Unfortunately, he died in 2000 when the project was still in its planning stages.